WORKING WITH WERCO

One manufacturing partner.
A complete plan for your build.

Bring fabrication, machining, finishing, and assembly into one conversation. Start with the work you need delivered; we will review the processes and requirements with you.

Assembled steel access platform with yellow railings, grated stairs, and bolted connections in Werco's shop

FROM COMPONENT TO ASSEMBLY

Plan the interfaces between processes.

The finished part depends on more than a single operation. Discuss machined features on a weldment, masking before coating, or hardware and wiring after finish as part of the same scope.

We work with aerospace, defense, industrial, and data center teams. Start with a component or discuss the complete assembly; the manufacturing sequence is determined by your design and requirements.

See work from our shop

YOUR PROJECT BRIEF

What helps us review your project

You do not need every detail to start a conversation. Share what is available and identify open questions. Keep classified, export-controlled, and CUI technical data out of website fields and uploads.

  1. 01

    Define the finished deliverable

    Specify individual parts, a fabrication, or a complete assembly. Include the drawing revision, bill of materials, and which items Werco or your team will supply.

  2. 02

    Identify the manufacturing requirements

    Provide material grades and specifications, critical dimensions, tolerances, weld details, and mating interfaces. Include a dimensioned drawing alongside the model when available.

  3. 03

    Set the finish and assembly scope

    List coating requirements, cosmetic surfaces, masking, hardware, wiring, and any customer-supplied components. Define packaging and handling needs for the finished build.

  4. 04

    Specify how the work will be accepted

    Identify inspection, traceability, first-article, test, and documentation requirements. Include applicable specifications and customer flowdowns so the scope can be reviewed before quoting.

  5. 05

    Explain quantity and timing

    Separate the initial order from expected repeat demand. Identify prototypes, pilot builds, production quantities, target delivery dates, and any phased releases.

  6. 06

    Arrange the right file transfer

    Ordinary supporting files can go through the RFQ form: up to three files, 100 MB combined. For an NDA, a larger package, or controlled technical data, start with a general description and arrange the transfer with our team.

SUPPLIER QUALIFICATION

Build your sourcing packet.

Werco has manufactured in Broken Arrow, Oklahoma since 1987. 130,000 sq. ft. across three active facilities, with a fourth facility coming online.

CAGE 3E9X5

Download the capability statement and AS9100D / ISO 9001:2015 certificate. Review our NAICS codes, the certified site and scope, then discuss any additional program requirements with our team.

Bring us the build you have in mind.

Share your scope and target schedule. Our team will review the requirements and follow up with next steps.